Holbrook Biomass Power Plant, Sheffield, England

blank_759_568
blank_759_568
blank_759_568

7.5 MWe Biomass power plant

Kantor Scope Included:

  • Full EPC contract scope
  • Full responsibility for detailed design (Stage 2 – Stage 5)
  • Specialist technology provider integration and management
  • Design and provision of heat network connection infrastructure
  • CDM Principle Designer
  • Environmental Permit variation application
  • Project management
  • Commissioning management

Client: Equitix