Having been appointed D&B contractor for the heat network at Colindale Gardens, Kantor successfully delivered the 21 MWt Energy Centre and first network phase in 2019. In 2024 we continue to build out the wider network, which will ultimately supply approx. 4,000 homes.
Archives: Project
Project
Chelsea Waterfront Energy Centre & Heat Network
Kantor acted as heat network D&B contractor at this prestigious West London development. Our scope included the 4.4 MWt CHP led heat network, as well as the 1.25MWt chilled water system, driven by roof and basement-mounted chillers.
Battersea Reach Community Energy Centre & Heat Network
Kantor designed and built the centralised energy centre & heat network for 1,000 apartments and 10,700m2 commercial area at Battersea Reach, including design and supply of the 506kWe CHP system complete with selective catalytic reduction (SCR).
Baddesley Energy from Waste Facility, Atherstone, England
Acting as EPC Contractor, Kantor successfully delivered this 10.5MWe energy from waste (EFW) power plant, which converts over 100,000 tonnes per annum of refuse derived fuel (RDF) to grid electricity. We have also operated and maintained the plant since its handover in 2021.
Holbrook Biomass Power Plant, Sheffield, England
This novel plant, converting over 60,000 tonnes of biomass fuel to 7MWe grid electricity via an innovative ‘organic rankine cycle’ (ORC) system was delivered as a turnkey EPC project by Kantor in 2017, meeting the deadline and requirements for Renewable Obligation support.