This was a greenfield project requiring the modification and extension of a facility to construct a state of the art biopharma unit. The project had a challenging schedule, with design running very close to construction to ensure that the facility could be completed at the earliest opportunity and enable life-saving products to go to market as soon as possible. Dornan’s scope included electrical and instrumentation installation, testing, loop-checking, and calibration of all process instrumentation.

Extraordinary solutions

  • Site-wide loop checking & calibration contract for over 4000 process instruments, extending into 2018
  • Calibration of all process instrumentation
  • Electrical and instrumentation installation fully integrated into the model by the Dornan BIM team

MV transformers, main and sub-main panels

UPS systems

Security and fire alarm systems